BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a residential development in Milwaukee, Wisconsin. Completed plans call for the renovation of a residential development.

Furnish labor, material and service necessary to remove/replace roof at 3211 North 20th Street, Milwaukee, WI 53206 Kelly Duncan at 414-286-5797 or Kelly.Duncan@hacm.org - Scattered Sites Manager. 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board on house. 3. Re-sheet roof with 4'x8'x7/16" OSB 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or install gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof. Install 18" wide ice and water shield on eaves covering top of drip edge flashing. 7. Install engineered roof barrier/membrane. GAF Shingle Mate or equivalent compatible with chosen roofing system. 8. Install starter strips at base of roof and roof eaves. Step flashing (4x4x8 galvanized) should be used at all edges, chimneys and where else applicable. Note: flashing shall be installed under the shingles. All joints must be fitted tightly, accurately, and strapped securely to house and garage. Not to secure roof straps on shingles. 9. Install ridge vent. CertainTeed 12" Filtered Exhaust Vent or approved equivalent compatible with roofing system. Seal openings from any prior venting. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. 10. Install new lead vent stack covers for all existing plumbing roof vents. 11. Install 30-year dimensional shingles Landmark CertainTeed, or approved equivalent. Project manager must approve the color before installation. Contractor shall use a minimum of 4 nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90- degree angle to surface. Installation to follow manufacturers guidelines. 12. Provide minimum 30-year manufacturers' warranty on installed roofing system. Section 3 Plan/Policy/Compliance Forms Package (Complete/sign applicable pages and return with bid) If you have any Section 3 and/or EBE questions, please contact Konita Jude at 414-286-2940 or Kpjude@hacm.org Liquidated damages in the amount of $50.00 may be assessed for each day of delay. Contractor shall provide lien waiver to Housing Authority of the City of Milwaukee, Attention: Stacey Shaw, 809 North Broadway, Milwaukee, WI 53202.

Bid Results

Residential Subdivision

$25,930.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
117
Bidding Soon
1,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

Project location map

3211 N 20th St, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.