Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Farmington, Connecticut. Completed plans call for the renovation of a educational facility.
Farmington Public Schools reserves the right to reject any or all bids and to waive any or all informalities or technical defects, if it is deemed to be in the best interest of Farmington Public Schools to do so. Question Deadline 06/22/2023 Disconnection and off-site disposal of the existing equipment and reclaiming of refrigerant is the responsibility of the contractor and all costs associated with such must be included in the bid price If a crane will be required to hoist off any equipment or to hoist on the new units, all costs and permits for crane work will be the responsibility of the contractor and the cost shall be included in the bid price. Each bid shall be accompanied by a Bid Guarantee in the form of cash, bid bond, certified check, treasurer's check or cashier's check made payable to Farmington Public Schools in an amount not less than 10% of the bid. The successful bidder upon award of bid will need to provide a 100% Performance Bond and a 100% Labor and Materials Bond. For all questions please contact: Sam Kilpatrick at kilpatricks@fpsct.org or 860-673-2514 x 7050 Disconnection and off-site disposal of the existing equipment and reclaiming of refrigerant is the responsibility of the contractor and all costs associated with such must be included in the bid price If a crane will be required to hoist off any equipment or to hoist on the new units, all costs and permits for crane work will be the responsibility of the contractor and the cost shall be included in the bid price. Coordination of schedule and placement of crane must be provided to the Facilities Director and approved by the him prior to mobilization. Any damages to the roof caused by careless work will be the responsibility of the contractor and will be repaired at the contractor's expense. The contractor is responsible for all electrical work needed for the replacement of the HVAC units. The contractorisresponsible forreconnecting the new unitsto the buildings energy management system, including any new modules/hardware required for 100% complete system. The contractor is responsible for commissioning the new equipment once it is installed to ensure proper functionality and code compliance. o Provide as-built drawings, manufacturer's O&M manuals and equipment schedules at the conclusion of the project. o Provide and program new Air Conditioning and integrate new Air Conditioning with the existing building automation controls system. o If any existing hazardous materials are required to be removed to complete the project they must be identified by the contractor. Proper and safe removal of the materials will be required and will be provided to the City of Farmington as a change order. The City of Farmington reserves the right to competitively bid the hazardous waste removal identified by the contractor. Contractor will provide a schedule to including construction milestones, task durations, and lead times for equipment. The schedule will be detailed by using number of days after contract award for each construction milestones, task durations, and lead times for equipment. o Alternate comparable equipment must be submitted for review and approval.
Bid Results
Educational
$92,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2023
July 5, 2023
2 School St, Farmington, CT
Related To This Project
Farmington, CT
Bid Date: Jun 27 2023
Farmington, CT
Bid Date: Sep 12 2023
Farmington, CT
Bid Date: Aug 03 2023
Farmington, CT
--
Farmington, CT
--
Farmington, CT
Bid Date: Aug 21 2023
Farmington, CT
Bid Date: Sep 11 2023
Farmington, CT
Bid Date: Aug 28 2023
Farmington, CT
Bid Date: Jun 27 2023
Farmington, CT
--
Farmington, CT
Bid Date: Jun 05 2023
Farmington, CT
Bid Date: May 23 2023
Farmington, CT
--
Farmington, CT
Bid Date: May 05 2023
Farmington, CT
Bid Date: May 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.