Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a development in Aurora, Colorado. Completed plans call for site work for a development.
Reference Number 0000327126 Question Deadline 08/18/2023 at 2:00 PM MT Any questions must be submitted in writing by email to Ted Hartfelder, Manager, at thartfel@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the name and number in the email subject line and must be received Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet. This entails the design and subsequent construction of riverbank stabilization measures along an approximately 700-foot reach of the South Platte River at the City of Auroras (Citys) Prairie Waters System North Campus Well Field (Well Field). The Well Field, located on the west bank of the South Platte River approximately midway between Brighton and Fort Lupton, consists of a series of groundwater production wells which indirectly capture water from the South Platte River for the Citys consumptive use. These groundwater production wells are offset approximately 100 to 200 feet from the riverbank. Subsequent to construction, the Well Field periodically has experienced riverbank erosional damage resultant from channel alignment changes due to human and/or natural causes. As the Well Fields infrastructure is near the riverbank, riverbank erosion poses a threat to this infrastructure. This addresses the most recent riverbank erosion threat to the Well Field. Under this the riverbank within the reach will be properly stabilized, and where appropriate the bank edges will be restored (built up) to sufficiently protect the existing Well Field infrastructure. This work will include, but not be limited to, general grading and earthwork; dewatering and erosion control; placement of mixed and buried rock riprap; placement of COIR (or equivalent) blankets; and plantings for wetland, upland, and transition zone vegetation. Bank restoration and placement of riprap will require temporary diversion of the South Platte River and active dewatering at the toe of the reclaimed slope. All work will be performed on City-owned property. The estimated cost for this is from $1,300,000.00 to $1,600,000.00. The Contract Documents require that all work be Substantially Complete by December 29, 2023 with Final Completion by February 2, 2024 *The value for this is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official document. The City shall have the right to reject any and all Bids. A Bid not accompanied by the required Bid Security, other data or documentation required, or a Bid in any other way incomplete, irregular or unqualified, may be subject to rejection.
Post-Bid
Conservation and Development
$1,600,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2023
October 30, 2023
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jun 29 2023
Aurora, CO
Bid Date: Jun 30 2023
Aurora, CO
Bid Date: Aug 30 2023
Aurora, CO
Bid Date: Jul 26 2023
Aurora, CO
Bid Date: Jun 29 2023
Aurora, CO
Bid Date: Jul 07 2023
Aurora, CO
Bid Date: Jul 06 2023
Aurora, CO
Bid Date: Sep 28 2023
Aurora, CO
Bid Date: Jun 16 2023
Aurora, CO
Bid Date: Jul 14 2023
Aurora, CO
Bid Date: Jun 20 2023
Aurora, CO
Bid Date: Jun 20 2023
Aurora, CO
Bid Date: Jun 16 2023
Aurora, CO
--
Aurora, CO
Bid Date: Jun 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.