BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gulfport, Mississippi. Contact the soliciting agency for additional information.

All questions in reference to this RFQ shall be directed in writing to jversiga@gulfport-ms.gov. The last day to submit questions will be June 20, 2023 at 10:00 am. The City of Gulfport intends to employ a consulting engineering firm to provide engineering services utilizing a Cost plus Fixed Fee, Labor Hour/Unit Price or Lump Sum/Firm Fixed Price contract for installation of two new water wells within Gulfport's certificated water franchise area. The Consultant's scope of services includes, but is not limited to, surveying, hydraulic modeling, development of construction plans/specifications, deeds for purchases, environmental related services, bidding phase services, construction engineering, and inspection services. Upon selection, negotiation, and execution of contract, the City of Gulfport anticipates the duration of the consultant's contract to be approximately two (2) years, executing the said contract on or about July 2023. Consulting engineering firms interested in providing these services may so indicate by furnishing the City of Gulfport one (1) original and one (1) copy plus a digital version of their Qualifications which should consist of the following: 1. A cover letter specifying the name and complete description of project, the name of the project manager, and the location and address of the office to be assigned the majority of the work; 2. A resume for each principal member, the project manager, and employee(s) of the firm anticipated to be assigned to the project. Also, provide an organizational chart and list each person's experience and qualifications, including proof that the Project Manager is licensed as a Mississippi Professional Engineer and that the firm has met state licensure and certification requirements*; 3. A description of similar type work completed during the past five (5) years which qualifies the consultant for this work; the consultant's cost and consultant's schedule completion and actual completion of this work; 4. Provide any information to indicate that the team has the necessary resources, including available staff, to complete the project within the timeframe indicated above. The Consultant should indicate any other active and planned projects that any individuals, as listed on the organization chart (including any subconsultant(s)), are currently working to complete. The consultant should indicate how they plan to balance workloads to commit the staff and resources necessary to successfully complete the project on- time. 5. A response containing the information upon which the consultant will be evaluated; and, 6. Part II of Standard Form (SF) 330, Architect-Engineer Qualifications. This Form can be obtained online. The City of Gulfport will evaluate the Qualifications based on the following factors listed in their relative order of importance: 1. The experience in performing the type of work outlined in the Scope of Work; 2. Qualifications of the principals and professionals to be assigned; 3. The consultant's experience in working with projects involving public funding; 4. The extent of in-house capabilities of the firm; and 5. The consultant's size and capability of available staff to perform this work in accordance with an expedited progress schedule, considering the firm's current and planned workload. The City of Gulfport reserves the right to select one (1) consultant or select a short list of consultants from whom more information will be required. The City of Gulfport reserves the right to reject any and all Qualifications and/or to discontinue contract execution with any party at any time prior to final contract execution.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
39
Bidding Soon
471
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

img_map_placeholder

Multiple Locations, Gulfport, MS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.