BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Springfield, Missouri. Completed plans call for site work for a power facility.

Question Deadline 06/16/2023 The site work at the City Utilities' Galloway Substation, 2660 E. Seminole St., Springfield, Missouri will include, but is not limited to: - Making an addition to, and modifying the existing driveway with paving and curbing re-design - Restoration of any damage caused by the construction work performed. - The work will also include marking up construction issue drawings for as built changes and/or deviations from the design drawings; returning to City Utilities completed certain test and checkout/inspection documents and as-built drawings; and miscellaneous other work as detailed within these contract specifications. - Contractor shall provide all labor, tools, equipment, and materials to accomplish the work unless otherwise stated that these items will be supplied by City Utilities as identified within the technical Specifications. Each proposal must be accompanied by a Bid Bond with an adequate surety, naming the City Utilities of Springfield, Missouri, as obligee, in a penal sum equal to five percent of the maximum bid price excluding options, or in lieu thereof, a certified check drawn on a Federally insured banking institution, payable to City Utilities in the same amount as the penalty of the Bond. The Bond or Check shall be conditioned that should a bidder, after award, fail to enter into a contract, then the entire amount of the Bond or Check shall become the property of the City Utilities, or City Utilities shall be entitled to recover the entire penal sum of the Bond or Check without further proof of damage. Bid Checks will be returned to all unsuccessful bidders within a period of thirty days following contract execution. The Contractors work on this project is to start as soon as possible after July 5th, 2023, and be substantially completed by July 31st, 2023, such that City Utilities (CU) may resume normal use of ingress and egress routes for the substation. Contractor is expected to have minimal support personnel present during CUs final inspection process

Award

Power Plant

$870,000.00

Public - City

Site Work

8

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
358
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

July 5, 2023

img_map_placeholder

2660 E Seminole St, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.