Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Goochland, Virginia. Completed plans call for the renovation of a detention facility.
The project is described as the replacement of isolation and non-return valves (steam stop check valves) at two facilities: three (3) boilers at Virginia Correctional Center for Women (VCCW) boiler plant at 2841 River Rd West, Goochland, VA 23063 and three (3) boilers at the Powhatan CC boiler plant, 3600 Woods Way, State Farm, VA 23160. 1.Verify to confirm sizes, locations, alignment, orientation, types, and connections of existing valves, piping, etc. Notify owner immediately of any discrepancies. 2. Submit valve submittals to IEMU for approvals prior to ordering. All valves to be rated for steam service usage. All valves to be new, WCB/CS/IBBM flanged valves, with gaskets and bolt kits for a complete installation. All gaskets to be new spiral wound flex gaskets. All 4" valves to be 250 class. 6" and 8" diameter valves to be 150 class. 3. Powhatan boiler plant: valve replacements: a. Three (3) 4" diameter angled stop-check valves (boilers 1, 2, and 3) b. Three (3) 4" diameter isolation valves (boilers 1, 2, and 3) 4. VCCW boiler plant: valve replacements: a. Three (3) 4" diameter angled stop-check valve (boilers 1, 2, & 3) b. Three (3) 6" diameter isolation valves (boilers 1, 2, and 3) c. One (1) 8" diameter main steam isolation valve (on VCCW header) 5. Procure valves, gaskets, and bolt kits and deliver to job sites. 6. Provide all equipment and labor to set the job sites up prior to steam outage. Rig chain falls into place over the existing non-return valves and place equipment onsite to remove and replace the valves. 7. Coordinate boiler shut downs and isolation with facility staff to minimize disruptions and interruption of service. 8. Provide all equipment, labor, and materials to remove existing valves at each site. Inspect and clean boiler steam nozzle flanges and flanges on discharge side of the steam piping and ensure that no steam cutting is evident. Repair flanges as necessary if flanges are steam cut. Rig old valves to floor & make ready for new valves. 9. Provide all equipment, labor and material to rig all new non-return valves onto boiler steam nozzles (typical of 3 at each site). Install gaskets between steam nozzles and valves and between valves and steam piping. Bolt up new valves with new bolt kits. 10. Ensure no leaks are detected and ensure proper systems operation prior to placing system back into operation. 11. Clean site and remove off site all related material, debris, and replaced valves. Additional Items Included in Scope are as Follows: 1. Complete all background checks of employees entering the job site at least one week prior to job start. Complete any required training prior to site entry. 2. Comply with all site security measures and prohibitions including but not limited to no weapons, smoking, tobacco, or vaping products, illegal drugs, alcohol, or other contraband, etc. on DOC property. Please note that there may be clothing restrictions. 3. Comply with all items in the Instruction to Bidders (Form CO-7a). Comply with the General Terms and Conditions (CO-7). 4. Comply with the executed Construction Contract (CO-9). 5. To ensure no additional stresses or loads are introduced on the header piping, the contractor is not permitted to modify, move, or displace the steam header piping in any way or use spool pieces or spacers. The following items are not required: Bid Bonds, Performance and Payment Bonds. The Owner reserves the right to reject any or all bids.
Bid Results
Jails / Prisons
$39,700.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2023
July 27, 2023
Multiple Locations, Goochland, VA
Related To This Project
Goochland, VA
Bid Date: Oct 25 2019
Goochland, VA
--
Goochland, VA
--
Goochland, VA
Bid Date: Sep 21 2023
Goochland, VA
Bid Date: Jan 20 2022
Goochland, VA
Bid Date: Mar 03 2022
Goochland, VA
Bid Date: Mar 03 2022
Goochland, VA
Bid Date: Feb 23 2022
Goochland, VA
Bid Date: May 16 2023
Goochland, VA
Bid Date: May 15 2023
Goochland, VA
Bid Date: Apr 13 2023
Goochland, VA
Bid Date: Mar 02 2023
Goochland, VA
--
Goochland, VA
Bid Date: Apr 16 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.