BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Charlottesville, Virginia. Contact the soliciting agency for additional information.

The University of Virginia (University or UVA) invites highly qualified Architectural/ Engineering (A/E) firms to submit a Letter of Interest/Statement of Qualifications and associated supporting materials for consideration in the selection of a consultant team to provide programming, planning, architectural, and engineering design services for the design and construction of the Fontaine Data Center at UVA's Fontaine Research Park (Fontaine), in accordance with the latest version of the UVA Higher Education Capital Outlay Manual (HECOM). The first phase of the project will be pre-design. Upon successful completion of the pre-design effort, the University may in its sole discretion elect to retain the selected firm for full design and construction services for any or all phases of the future project. Purpose and Program Background: In 2022, the University charged the High Performance Computing Infrastructure Committee (HPC-IC) to project research computing needs and the infrastructure necessary to support those needs over the next 5-10 years. The HPC-IC had considerable conversation about the importance of a solid, leading edge HPC infrastructure. It serves as the foundation for a robust research program, aligns us with our peers, and enables us to become competitive both for the faculty we can recruit and the research we can perform. The committee looked at many options to expand the existing data center capacity to meet the growth needs and recommended a new data center in the Fontaine Research Park with the expectation that it will be operational in 2026. Project Drivers: The University currently operates 2 data centers, the University Data Center (UDC), which opened in 2011, and the Carruthers Data Center (remodeled in 2014). Both facilities provide back-up power capabilities and air-cooled racks, which have reasonable power and cooling for historica land current data center needs. Given the current growth of HPC, the UDC is expected to reach its UPS (Uninterruptable Power Supply) and cooling capacity in 2024. In addition to capacity constraints, the UDC in its current design will not support the more modern, higher power rack density for newer HPC machines. The proposed new facility is assumed to have an initial capacity of 8MW with future expansion to 16MW with Tier II resiliency. In addition, the building and associated infrastructure shall: Ensure that appropriate information security and regulatory compliance requirements are met. Consider University sustainability goals and how synergies may be exploited. Be cost effective, both initial capital or up-front costs as well as lifecycle maintenance, update of hardware, and leasing/ licensing costs. All questions should be directed ONLY to Bruce Jackson at 434-924-6387 or brj2n@virginia.edu

Conceptual

Educational

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
80
Bidding Soon
1,734
All Active Projects
772
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 16, 2024

img_map_placeholder

Multiple Locations, Charlottesville, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.