BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Longview, Texas. Completed plans call for the renovation of a water / sewer project.

For furnishing all labor, materials, equipment, supplies, and supervision necessary for the construction of the GRACE CREEK WASTEWATER TREATMENT PLANT BOILER REPLACEMENT AND DIGESTER TRANSFER MODIFICATIONS, in accordance with the plans and specifications on file at the office of Public WorksService Center Please submit questions for this project at least five (5) days prior to bid opening through www.civcastusa.com in the Q&A portal. Question Deadline 07/06/2023 Replacement of the existing boiler at the WWTP with condensing type boiler including modifications to the gas supply, make up water, surge system, hot water return system, hot water supply system, for a complete and operable condensing boiler and hot water system. Modification of hot water system piping, valves, fittings, pipe supports, pipe insulation, jacket, and appurtenances to integrate the new boiler with the existing hot water supply system Modification of the hot water circulation piping to add new flow meters with integral temperature for hot water return (3x). Modification of the hot water circulation system to add flow control valves (3x) to the hot water supply lines for each heart exchange unit. Modification of existing electrical and controls to integrate the new boiler, flow control valves, and temperature readings with the existing hot water circulation pumps, electrical, and controls and Plant SCADA system Modification of the sludge circulation lines to add new mag meters (3x) to determine the return flow between Heater Exchange Units 1, 2, and 3 and Primary Digesters 1, 2, and 3. Modification of the sludge circulation system to include sludge (HEX) temperatures for both the sludge supply (3x) and sludge return (3x) Modification of the sludge circulation system to include sludge (HEX) flow control valves (3x) for the sludge supply lines between the circulation pumps and the heat exchange units. Modification of the sludge circulation pump discharge piping to include a bypass connection (3x) and motor operated plug valve (3x) at each pump. Modification of existing sludge transfer piping to include a transfer sludge flow control valve (lx) and a transfer sludge mag meter (lx) to transfer digester sludge for the Primary Digesters to the Secondary Digeste Modification of existing electrical and control to integrate sludge circulation (HEX) flow control valves, HEX sludge temperatures, and HEX sludge flow meters with the existing HEX sludge circulation pumps, heat exchange units, boiler, hot water system, and Plant SCADA system Modification of existing electrical and controls to integrate sludge transfer plugs valves, sludge transfer flow control valve, and sludge transfer flow meter with the existing HEX sludge circulation pumps, heat exchange units, boiler, hot water system, and Plant SCADA system.

Post-Bid

Water / Sewer

$1,340,000.00

Public - City

Renovation

21

16

2

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
43
Bidding Soon
775
All Active Projects
364
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 13, 2023

September 11, 2023

June 7, 2024

img_map_placeholder

To Be Determined, Longview, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.