Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 26, 2023 at 8:00 PM
Updated January 31, 2024
Demolition, site work, paving and new construction of a civil project in Morenci, Arizona. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
The proposed project is located in Graham County on US-191, from milepost (MP) 104.50 to MP 113.61, south of Safford. The work consists of pavement and minor bridge rehabilitation. The work includes milling and repaving of mainline travel lanes, shoulders, and bridge decks overlay, removing and replacing cattle guards, guard rails, shoulder build-up, pavement marking, and other related work. AZDOT - Pavement Rehabilitation The contractor shall prepare and submit traffic control plans to the Engineer for review and approval two weeks prior to the start of the project construction activities (or at the Preconstruction Conference). The traffic control plans shall conform to the requirements of Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD), 2009, the Arizona Department of Transportation Temporary Traffic Control Design Guidelines, 2019, the Arizona Supplement to the (MUTCD) 2009, these Special Provisions and to Section 701 Maintenance and Protection of Traffic of the ADOT Standard Specifications for Road and Bridge Construction, 2021. Construction work activities that impact traffic shall not begin until the traffic plan and days and times impacted have been approved by the Engineer. No separate measurement or direct payment will be made for the preparation and submittal of traffic control plans for review and approval; it will be considered included in the price of contract bid items. The contractor shall contact Department of Public Safety (DPS) and or Local Law Enforcement, local Fire Department and local ambulance services a minimum of 72 hours in advance of any roadway restrictions.
Award
Roads / Highways
$7,993,933.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2023
October 3, 2023
US-191, Morenci, AZ
Related To This Project
Morenci, AZ
Bid Date: Feb 09 2024
Morenci, AZ
Bid Date: Apr 12 2024
Morenci, AZ
Bid Date: May 09 2024
Morenci, AZ
Bid Date: May 08 2026
Morenci, AZ
Bid Date: May 26 2022
Tucson, AZ
--
Phoenix, AZ
Bid Date: Aug 21 2023
DM AFB, AZ
Bid Date: Jun 14 2023
Pima, AZ
Bid Date: Jun 29 2023
Chinle, AZ
Bid Date: Aug 09 2023
Glendale, AZ
Bid Date: Oct 13 2023
Scottsdale, AZ
Bid Date: Jun 28 2023
Alpine, AZ
Bid Date: Jul 24 2023
Buckeye, AZ
--
Goodyear, AZ
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed