BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Salisbury, North Carolina. Completed plans call for the renovation of a medical facility.

36C24624B0001 Update PA System Amendment 0003 Responses to Vendor Questions If you are looking to keep the current analog amplifiers and speakers in the facilities, but convert the system to IP, our Zone Controller would be the ideal device to bridge the gap between analog anA IP. Would that be fine Response: The SOW is to replace current head-end equipment to include amplifiers. VHA Salisbury is willing to accept design changes as long as it sustains or improves the system and the design stays within the project s SOW. For the buildings that don't have a paging system, are you looking for speaker-only devices, or would you be interested in considering our display/speaker combination devices Response: Speaker only devices. Would your main goal be to switch all the buildings to one type of programmable software that would drive all paging & intercom functions Do you need something that is cloud-based or controlled from each individual Response: One type of programable software. What existing Paging System does the VA have We didn t see that info in the specs or drawings and need to be able to tie-into that system and didn t see the make/model so we can it. Response: Main equipment is to be replaced. This question is irrelevant. Only existing speakers to remain. Please confirm that all the RFI response Amendments from the previously issued Solicitation for this same scope of work all apply to this Solicitation, or that they are otherwise incorporated into the design plans and specifications. Response: All RFI responses from the previous solicitation have been incorporated into this solicitation s drawings, specifications, and SOW. Is an Electrician company assigned to this scope of work Response: No, it is the General Contractor s responsibility to provide an electrical subcontractor. Who is responsible for the installation of Pathways Response: The General Contractor and their Subcontractors. Can we schedule a walk to determine the length of OS2 6 strand fiber will be needed for eachA building Response: The solicitation drawings should give you a general idea of fiber length as they are drawn to scale. Additional walkthroughs will be after contract award. Is there a General Contractor Response: The awardee will be the acting General Contractor. Is the secured space for storage on . Response: Yes. During the pre-construction , the facility s COR will show the Contractor where they can up their laydown yard/conex. Are the existing speakers 70V or 24V Response: Bldg. 8 has amplified speakers (24V). All other speakers are 70V. Who is doing the demo Response: The General Contractor to whom this project is awarded. Will the Existing paging remain operational until new system is online Response: Yes, the existing paging is considered life safety and needs to remain operational. If there is a need to shut down the system, a two-week notice needs to be approved and the shutdown will be after hours when the facility is least impacted. of Construction: Between $2M and $5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Medical

$1,933,780.00

Public - Federal

Renovation

123

28

11

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
99
Bidding Soon
1,656
All Active Projects
692
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 13, 2023

February 12, 2024

February 11, 2025

img_map_placeholder

1601 Brenner Ave, Salisbury, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.