Site work and paving for a road / highway in Corte Madera, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done includes, but is not limited to, the following: furnishing labor,materials and equipment required to repair two section of concrete box culvert including placement of steel plate, angle iron, concrete anchorage, reinforcement bar, concrete and hot mix asphalt. The project is located in sensitive habitat, specifically Northern Spotted Owl nesting habitat. No construction work shall be permitted after January 31, 2024. Sealed bids for the Worn Spring Road Slide Repair Project This contract is for furnishing labor, material and equipment for the installation of a drilled soldier pile wall with concrete lagging, redwood guardrail and erosion control. The work to be done is located on MMWD Watershed Lands of the District near the Town of Ross within the County of Marin, California. The Contractor performing work under this contract shall possess a class A Contractors license which is valid in the State of California at the time the contract is awarded. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The prevailing rate of wages in the locality in which work is to be performed has been ascertained by the District and published under the provisions of Section 1773 of the California Labor Code. For the most current prevailing wage rates the Contractor may visit the state of California Prevailing Wage Determinations Copies of the prevailing wage rates are also on file and available at the Office of the Manager of Engineering at 220 Nellen Avenue, Corte Madera, and in the office of the Marin County Department of Public Works, Civic Center, Room 304, San Rafael, California. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor under him to pay not less than the said prevailing wage rates to all workers employed by them in the execution of the contract. On this contract, eight hours shall constitute a legal days work. Work beyond eight hours shall be paid at a rate not less than one and one-half times the prevailing rates. Wage rates for Sundays and holidays shall be paid at a rate not less than two times the prevailing rates. The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining agreement applicable to the particular craft, classification or type of workers employed on the project. Unless otherwise specified, proposals will be considered for the complete job only. In accordance with the Instructions to Bidders, all bid documents must be completed on forms supplied with the contract specifications. Each Bidder is requested to return the entire specification booklet. The Bidder must include a certified check, cash, cashiers check or bid bond executed by an admitted surety authorized by the California State Department of Insurance to transact business in California as a guarantee that the Bidder will, if successful, promptly execute a satisfactory contract and furnish bonds as required by these specifications. The certified check, cash, cashiers check or bid bond shall be not less than ten (10) percent of the total amount of the bid and shall be payable to the Marin Municipal Water District. In compliance with Section 22300 of the Public Contract Code, the Successful Bidder may, at his expense, choose to exercise one of the following options regarding retentions: (1) to deposit securities (under District control) equivalent to the retention amount normally withheld by the District; or (2) to execute an escrow agreement and have the District make retention payments directly to an escrow agent; or (3) to execute a retention agreement indicating that normal retention will be deposited in a joint account under District control. If an escrow agreement for security deposits is used in lieu of retention, it shall be in a form substantially similar to that specified in Public Contracts Code Section 22300. If any of the above options are chosen, the District will withhold no retention on progress payments. District control of securities or accounts will be released in the same manner as release of normal retention funds as indicated in the general specifications. Securities eligible for investment shall include those listed in Section 16430 of the Government Code or bank or savings and loan certificates of deposit. The Bidders attention is drawn to the General Specifications section regarding Dispute Resolution. This section provides any disputes or claims between the District and the Contractor are subject to mediation, and then if still unresolved, at the sole election of the District, to binding arbitration. The Bidders attention is also called to Marin Municipal Water District Code Sections 2.90.065 through 2.90.067 which permit the District to disqualify a Contractor from bidding on future contracts with the District if the contractor fails to comply with the rules and regulations specified in the Districts code or the requirements for performance specified in this contract including submission of false claims to the District. Bidders should contact their insurance brokers to verify that their insurance meets all insurance requirements of the contract and that their broker will provide a completed MMWD Additional Insured Endorsement. Bidders should provide pages XIV, XIV-a and XIV-b of the contract to their insurance brokers for reference. The District reserves the right to reject any and all bids and to waive any irregularities in said bids. Terrie Gillen, Secretary Board of Directors

Award

Roads / Highways

$175,910.00

Public - County

Paving, Site Work

7

13

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
49
Bidding Soon
1,728
All Active Projects
735
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

August 1, 2023

img_map_placeholder

220 Nellen Ave, Corte Madera, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.