BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Demolition, site work and renovation of a mixed-use development in Jacksonville, Florida. Completed plans call for the renovation of a transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

JAX - Jacksonville, FL Amtrak ADA & SOGR Station Renovation Description ADA SITE WORK/PARKING/PUBLIC RIGHT OF WAY · REMOVE APPROXIMATELY 800 FT OF EXISTING CONCRETE SIDE PLATFORM AND ITS ACCESS ROAD. · CONTRACTOR WILL REMOVE FIVE (5) EXISTING GRADE CROSSINGS AND RELOCATE FOUR (4) GRADE CROSSINGS AS INDICATED ON PLANS. · CONTRACTOR TO COORDINATE CROSSING REMOVALS WITH AMTRAK AND AMTRAK TRACK DESIGN. · REMOVE EXISTING EXPRESS PLATFORM AND RAMP TO LOADING DOCK. · REMOVE FENCE AND VEGETATION, AFFECTED BY NEW CONSTRUCTION WORK, SEE LANDSCAPE PLANS. · REPLACE AND RELOCATE BACK-FLOW PREVENTER. · INSTALL SITE FENCING AND GATES, INCLUDING NEW SITE FENCING AROUND EXISTING ELECTRICAL SUB-STATION. · REMOVE, STORE AND MAINTAIN TREES TO BE REMOVED DURING CONSTRUCTION. RELOCATE/REPLANT TREES IN THE PROPOSED LANDSCAPE AREAS AND WHERE TREES HAVE BEEN REMOVED DUE TO CONSTRUCTION. · RELOCATE OFFICE TRAILER AND ASSOCIATED RAMPS, ACCESS WALKWAYS AND ALL UTILITY CONNECTIONS. · PROVIDE SITE GRADING, DRAINAGE AND UTILITIES TO SUPPORT NEW PLATFORM AND ACCESS ROAD. IDENTIFY EXISTING SUB-GRADE DRAINAGE SYSTEM AND DESIGN CONNECTIONS. · MODIFY EXISTING WALKWAYS AND PROVIDE NEW WALKWAYS THAT CONNECT TO THE PLATFORM, STATION, AND EXISTING AREAS. · PROVIDE ACCESS ROADWAY FOR REFUELING TRUCKS AND BAGGAGE HANDLING CIRCULATION. · PROVIDE NEW GROUND POWER EQUIPMENT AT TWO LOCATIONS. · REMOVE AND RELOCATE EXISTING FLAGPOLE. PLATFORM · PROVIDE 48" ATR SIDE PLATFORM DIVIDED IN TWO PARTS WITH A TOTAL LENGTH OF 750 FT AND 12 FT CLEAR WIDTH, WITH NECESSARY EGRESS REQUIREMENTS, RAILINGS AND DETECTABLE WARNING STRIPS. PLATFORM TO ACCOMMODATE BAGGAGE HANDLING. · PROVIDE CANOPY FOR NEW SIDE PLATFORM WITH FOUNDATIONS. · PROVIDE COMPLIANT TRANSITION TO PLATFORM FROM STATION ENTRANCE, INCLUDING COMPLIANT RAMPS. · PROVIDE NEW ELECTRICAL CIRCUITS AND LIGHTING ALONG ENTIRE PLATFORM. STORM WATER MANAGEMENT · PROVIDE NEW STORM WATER MANAGEMENT SYSTEM. · PROVIDE NEW PLATFORM UNDERDRAIN DESIGN. SIGNAGE · PROVIDE NEW PLATFORM SIGNAGE PER AMTRAK REQUIREMENTS.

Post-Bid

Transportation Terminals

$2,500,000.00

Public - Federal

Demolition, Renovation, Site Work

44

21

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
58
Bidding Soon
1,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

April 16, 2026

Project location map

3570 Clifford Ln, Jacksonville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.