BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2023 at 8:00 PM

Updated December 3, 2024

Site work and new construction of an educational facility in Minneapolis, Minnesota. Completed plans call for the construction of a 37,800-square-foot, two-story above grade educational facility; and for site work for a educational facility.

Construction Manager Services for a new Advanced Operations Center, located on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The Board of Regents of the University of Minnesota (the University) is requesting Proposals to provide construction manager services for a new Advanced Operations Center, located on the east bank of the Twin Cities campus (the Project). The proposed Advanced Operations Center (AOC) will include a two (2) story 33,000 sq ft University mission critical Tier III (alike) facility that will relocate the network operations center function from 2218 University Avenue along with the data center functions for the West Bank Office Building (WBOB). The University conducted a Predesign in 2022-2023 which analyzed the baseline project objectives for this facility along with studying utility/ fiber routing and site selection. The new facility will be sited at the north end of Lot C33 located on the East Bank Campus (northwest of Huntington Bank Stadium). The Project is located within an active part of the campus and adjacent to sensitive research facilities where vibration and noise can be a concern. CMaR to consider and develop construction methods to mitigate noise and vibration. CMaR will facilitate vibration monitoring that aligns with research criteria requirements. In addition, the Project abuts non-University owned property which includes Rail Road and the City of Minneapolis. The CMaR will be required to work closely with Planning, Space, and Real Estate (PSRE) to ensure proper protocols/ jurisdictional requirements are followed. The University has established a construction budget for the Cost of the Work in the amount of $38,400,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than November 28, 2025. Deadline for RFP Questions July 6, 2023 at Noon Space Usage/Program attachedYes No Brief Description of Project: Relocate the existing Network Operation Center (NOC) from 2218 University Ave along with the Data service functions located in the Basement of WBOB to a new free standing facility located in the BDD District of the East Bank Campus. Relocation is required to accommodate future 3rd party land development and long-range campus planning. Key Program Objectives and Measures for Success: Design a free standing network/ data center that can meet the University

Award

Educational

$38,400,000.00

Public - State/Provincial

New Construction, Site Work

6

10

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
121
Bidding Soon
1,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

October 1, 2024

Project location map

Multiple Locations, Minneapolis, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.