BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Plymouth, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The replacement of approximately 530 LF of walkway near Unit 15 along with associated grading to reduce slope of walkway. The existing walkway is concrete and the proposed walkway is asphalt

Award

Jails / Prisons

$139,854.00

Public - State/Provincial

Paving, Site Work

11

10

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
112
Bidding Soon
1,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

September 1, 2023

Project location map

W9071 Forest Dr, Plymouth, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.