BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in East Haven, Connecticut. Working plans call for site work for a 26,880-square-foot playground / park / athletic field.

As of July 24, 2023 project is on canceled . No info for the rebid. For new construction projects over $1,000,000 and remodel/maintenance projects over $100,000, contractors must comply with State Prevailing Fair Wage Provisions. The Director of Finance reserves the right to reject any and all Bids or to waive defects in same if it be deemed in the best interest of the Town of East Haven to do so. RECLAIM 26,880 sq. ft. of existing asphalt b. GRADING - Laser Grade to establish 1% pitch c. NET POSTS - Furnish and install one set of tennis net post footings and four sets of Pickleball footings. d. ASPHALT -Furnish and install asphalt lifts - 1 1\2" lifts for a total thickness of 3" compacted to 2 1\2". Let cure for 21 days. e. FENCE -Furnish and install 928 l.f. 10 foot high black chain-link fence and 48 l.f. of 4'high fence. f. COLOR COATING - Furnish and install the (3) coat acrylic color coating surface system to entire area including: resurface coat, color coat, and finish coat. g. TENNIS LINES -Layout and stripe lines per USTA. Apply one coat of acrylic line primer. Once line primer has cured apply one coat of textured white line paint. Paint must provide sharp lines for greater durability and longevity. The line paint should be textured. h. PICKLEBALL LINES -Layout and stripe lines per USAPA. Apply one coat of acrylic Line primer. One line primer has cured apply one coat of textured white line paint. A two coat application should provide sharp lines with greater durability and longevity. The line paint should be textured Any questions should be directed to the Contract Compliance Unit, Wage and Workplace Standards Division, Connecticut Department ofLabor, 200 Folly Brook Blvd., Wethersfield, CT 06109 at (860)263-6790

Final Planning

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
262
Bidding Soon
4,228
All Active Projects
1,781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2023

January 24, 2024

img_map_placeholder

67 Hudson St, East Haven, CT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.