BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Clifton Park, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project includes the full-depth reconstruction of Settler's Hill Trail which was damaged during recent overlay operations. The damaged portion of the trail is located between Miller Road and Wallflower Drive This project includes the full-depth reconstruction of Settler's Hill Trail which was damaged during recent overlay operations. The damaged portion of the trail is located between Miller Road and Wallflower Drive Question Deadline 06/26/2023 Each bid must be accompanied by security bond or certified check, in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders The Town of Clifton Park reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids Responsibility of the Contractor The Contractor will be held responsible for the execution of a satisfactory and complete piece of work, in accordance with the true intent of the drawings and specifications. The Contractor shall provide, without extra charge, all incidental items required as a part of the work including, even though not particularly specified or indicated. If there is good reason for objecting to the use of any material, appliance, or method of construction as shown or specified, the Contractor shall report such objections to the Engineer, and if approved by the Engineer, shall obtain proper adjustment before the Contract is made, and then shall proceed with the work with the understanding that a satisfactory job will be required. The Contractor is solely responsible for site safety and adherence to OSHA regulations General Scope of Work - Contractor: 1. On-site maintenance and protection of traffic during construction within 500 LF of project, each end at Wallflower Drive and Miller Road. 2. Layout of the reconstructed trail to match existing horizontal and vertical elevations and constructed per the items in Contract. 3. Installation of ADA compliant asphalt multi-use trail. 4. Topsoil Restoration. 5. Maintaining the existing HDPE culverts

Bid Results

Roads / Highways

$417,145.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
80
Bidding Soon
1,180
All Active Projects
564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

August 28, 2023

img_map_placeholder

Settlers Hill Trail, Clifton Park, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.