BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a water / sewer project in Hurlburt Field, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The 1 SOCONS/PKB Contracting Squadron is issuing this request for proposal (RFP) as a 100% Small Business set aside. This contract will be a firm-fixed price (FFP) contract to provide an addition to the Child Development Center (CDC) West, Building 90306 at Hurlburt Field AFB, Florida. Project Number CP1024656. This is for a construction contract; design documents are provided with this solicitation. This contract will be funded by Non-Appropriated Funds (NAF) and will adhere to NAF guidance, regulations, and clauses. FAR, DAFFARS and AFFARS regulations and clauses are not applicable. The period of is 330 calendar days. The work includes an approximately 3850 SF addition to existing Child Development Center. The addition includes 3 infant activity rooms, corridor, and facility support spaces. An outdoor play area of approximately 1250 SF is immediately adjacent this addition. Work includes minor demolition at existing facility to tie in the new addition as well as sitework, utilities, finishes and casework. Existing building HVAC, electrical, communications, plumbing and fire protection systems will be modified to support the addition. The first solictation amendment has been completely voided and it is "not" required to be provided with a proposal submission. For more information, please see the solicitation and attachments. This is a nonappropriated fund purchase and it does not obligate appropriated funds of the United States Government. Nonappropriated funds are generated by the military community through the sale of goods and services and the collection of fees and charges for participation in military community programs. This purchase does not involve federal tax dollars. All questions and proposal correspondence if applicable is to be sent directly to Tina L. Kneip, tina.kneip.1@us.af.mil and Christine Young, christine.young.1@us.af.mil. All questions are to be emailed not later than 4:00 p.m. CST on Friday, 3 November 2023 The of this project is between $1 million and $5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Addition, Demolition, Renovation, Site Work

189

57

12

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
68
Bidding Soon
1,017
All Active Projects
462
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 20, 2023

January 19, 2024

December 14, 2024

img_map_placeholder

26 Weaver Ave, Hurlburt Field, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.