BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2023 at 7:00 PM

Updated December 30, 2023

Site work and paving for a road / highway in Farmington, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

County: Davis This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code as 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code as 13-8-5 (1) for More Information. Wage Rates: N/a Engineer's Estimate: Greater Than $80m but Less Than or Equal $100m Mandatory Prequalification Required (Qualified Health Insurance Required) UTDOT - I-15; Shepard Ln Intchg & Ped Overpass New Interchange on Existing Freeway *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$90,619,380.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

January 29, 2024

Project location map

I-15, Farmington, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.