Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Springfield, Missouri. Contact the soliciting agency for additional information.
The offeror hereby agrees to furnish items and/or services pursuant to all requirements and specifications contained in this document, upon either the receipt of an authorized purchase order from Ozarks Technical Community College, or when this document is countersigned by Ozarks Technical Community College as a binding contract. The offeror further agrees that the language of this document shall govern in the event of a conflict with the offeror's bid. Payment will occur no sooner than 30 days after receipt and acceptance of items and/or services or receipt of correct invoice whichever is later. a) Annual Inspections and maintenance must be performed by a trained person who has undergone the instructions and is familiar with current ASME Code A-17 (Reference pages 12 & 13) necessary to perform the maintenance and inspection service. (Annual state inspections/certificates paid Ozarks Technical Community College) b) Springfield Main Campus location -- 1001 E. Chestnut Expressway Springfield c) Richwood Valley Campus location -- 3369 West Jackson Street, Ozark, MO d) Table Rock Campus location - 10698 Historic Hwy. 165, Hollister, MO e) Additional Scope of work on pages 18-22 The contractor shall furnish all management, labor, tools, scanner, analyzer, and any other equipment (electronic and otherwise), transportation, materials, and parts necessary to inspect, test, maintain and repair elevators as set forth in this statement of work (SOW). All work shall be performed in accordance with (IAW) this SOW and shall conform to the terms, standards, and conditions of the supporting contract. Specific maintenance tasks performed shall be (IAW) the procedures outlined by the respective elevator/escalator manufacturer. The contractor will perform maintenance visits to examine, maintain, adjust and lubricated the components listed below. The contractor will repair or replace the components listed if the repair or replacement is in the contractors' sole judgment, necessitated by normal wear and tear. o Relay Logic Control System o Microprocessor Control System o Power Unit o Hydraulic System Accessories o Car Equipment o Geared/Gearless Machines o Wiring o Hoistway and Pit Equipment o Rails and Guides o Ropes o Door Equipment o Manual Freight Door Equipment o Power Freight Door Equipment o Signals and Accessories.
Post-Bid
Educational
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2023
July 26, 2023
Multiple Locations, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Jun 29 2023
Springfield, MO
Bid Date: Jul 19 2023
Springfield, MO
Bid Date: Jul 13 2023
Springfield, MO
Bid Date: Jul 20 2023
Springfield, MO
Bid Date: Jun 23 2023
Springfield, MO
Bid Date: Jun 27 2023
Springfield, MO
Bid Date: Jul 12 2023
Springfield, MO
--
Springfield, MO
Bid Date: Jul 25 2023
Springfield, MO
Bid Date: Jun 28 2023
Springfield, MO
Bid Date: Jun 21 2023
Springfield, MO
Bid Date: Jul 13 2023
Springfield, MO
Bid Date: Jun 30 2023
Springfield, MO
Bid Date: Jun 27 2023
Springfield, MO
Bid Date: Jun 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.