BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Appleton, Wisconsin. Completed plans call for the renovation of a municipal facility.

Remove and replace (Quantity of 60) FSP-951 smoke detectors Remove and replace (Quantity of 15) FST-951R heat detectors Remove and replace (Quantity of 8) bulk packs of B300-6-BP detector bases Remove and replace (Quantity of 15) NBG-12LX manual pull stations Remove and replace (Quantity of 5) FMM-1 monitor modules Remove and replace (Quantity of 5) FRM-1 relay modules Remove and replace (Quantity of 3) ISO-X Isolation modules 1. Work can be performed during normal business hours Mondays through Fridays excluding County observed holidays. 2. Contractor shall replace devices as they are removed so the system can be re- enabled at the end of each day. All devices shall be installed to manufactures recommendations and specifications. 3. Program fire alarm system as needed to accept and recognize new devices. 4. Contractor shall test each device and the system at the completion of the project to assure all devices are working as required. 5. Existing wiring to devices shall remain. Contractor is not responsible for replacing wiring to devices. 6. Contractor shall take care not to damage surfaces such as walls, ceiling and floors, however contractor will not be responsible for patching and painting of walls and ceilings if needed due to device replacement. 7. Contractor shall be responsible for any permits that are required for this project and all work shall meet all local codes. 8. Provide a one-year labor and materials warranty for project. Pricing shall be lump sum bid for all materials and associated with the replacement of the listed devices. Any questions that come up and require additional information will be posted online at www.outagamie.org then Bids / Proposals. Owner's Right to Stop Work If the contractor fails to correct Work which is not in accordance with the requirements of this RFB or fails to carry out Work in accordance with RFB, the County may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the County to stop Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. Owner's Right to Carry Out Work If the Contractor defaults or fails or neglects to carry out the Work in accordance with the RFB, or fails to perform a provision of the RFB, the County, after 10 days written notice to the Contractor and without prejudice to any other remedy the County may have, may make good such deficiencies and may deduct the reasonable cost thereof. Including County's expenses and compensation for the Architect's services made necessary thereby, from the payment then or thereafter due the Contractor. A PO will be issued by end of day July 14, 2023. Project shall be substantially completed by 3pm December 8, 2023. Failure to achieve substantial completion by December 8th will result in a $50 per calendar day liquidated damages penalty. Any questions that come up and require additional information will be posted online

Award

Municipal

$15,515.00

Public - County

Renovation

5

3

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
34
Bidding Soon
1,069
All Active Projects
309
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2023

August 10, 2023

December 8, 2023

img_map_placeholder

320 S Walnut St, Appleton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.