Remodeling of a power facility in Fredonia, New York. Completed plans call for the remodel of a power facility.

The work of this single bid project includes the replacement of emergency generators throughout the campus. The work generally includes, but is not limited to, the removal and replacement of six (6) natural gas emergency generators of various sizes from Fenton Hall, McEwen Hall, Thompson Hall, Mason Hall, Steel Hall Natatorium, and Carnahan Jackson Center. Removal of one (1) existing diesel fueled generator and above ground storage tank located outside of Steel Hall, and replacement with a natural gas generator with natural gas connection. For each generator in the scope, replace automatic transfer switches, provide remote tap boxes, and emergency e-stop buttons. The project also includes emergency circuits to provide emergency back-up power to existing digital signage in each building. Hazardous materials removal is included in the scope of work. EEO goals for this project: 6% minority workforce and 3% female workforce Contract term: 655 calendar days after receipt of the Notice to Proceed Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 12% Women Owned Sub-Contracting Goal: 8% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Estimated Range - $1,000,000 - $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Chemical Power Generation

$2,470,000.00

Public - State/Provincial

Remodeling

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Construction Progress Documentation, Periodic Work Observation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
102
Bidding Soon
1,360
All Active Projects
611
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

October 2, 2023

img_map_placeholder

280 Central Ave, Fredonia, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Emergency Generators

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.