BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Redondo Beach, California. Completed plans call for site work for a water / sewer project.

The purpose of the project is to return King Harbor to design navigational depth and to provide safe vessel access by removing shoals that have accumulated within the Harbor. This project includes dredging approximately 62,000 cubic yards of material inside two areas of the Harbor. The first dredged area is the shoal fronting the north portion of King Harbor North Breakwater and the second dredged area is the shoal fronting the inner portion of the South Breakwater at the entrance of Basin 3. The approximately 62,000 cubic yards of dredged material is to be placed at an approved US Army Corps of Engineers temporary nearshore placement site offshore generally located across from Avenue B in Redondo Beach The estimated cost of the above described work is $2,500,000. Bidders shall have an active Class "A" license from the Contractor's State License Board The project contract shall be completed and facility shall be made ready for service within 265 working days after the Notice to Proceed is issued. Contact project manager, Geraldine Trivedi, at 310-318-0661 ext. 2036, or by email at Geraldine.Trivedi@redondo.org for questions regarding this project.

Award

Water / Sewer

$2,992,000.00

Public - City

Site Work

28

20

4

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
270
Bidding Soon
3,751
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

September 18, 2023

Project location map

280 Marina Way, Redondo Beach, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.