BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Diego, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bid(10.0%), Performance(100.0%), Payment(100.0%) License Requirements A or C-27 The South Chollas Creek and Paradise Canyon Open Space Wetland Mitigation Project consists of enhancement and rehabilitation of riparian resources located at two different locations (mitigation sites) in the City of San Diego (City), California: (1) the South Chollas Creek Mitigation Site is located south of Imperial Avenue, north of Oceanview Boulevard, and east of Marketplace Avenue along Chollas Creek and (2) the Paradise Canyon Open Space Mitigation Site is located south of Skyline Drive, north-northeast of Bullock Drive, and east and west of Deep Dell Road in Paradise Canyon. Enhancement and rehabilitation shall be conducted at both mitigation sites within designated treatment areas, with staging and removed material stockpiling conducted (as needed, per shot-hole borer best practices) at locations identified on the Construction Documents. Contractor services required of this scope of work include a pre-project survey and staking of treatment areas (both mitigation sites), cut to grade and remove all exotic and all diseased native vegetation (per shot-hole borer best practices) from Project treatment areas (both mitigation sites), treat and stockpile removed diseased vegetation from the Project treatment areas at Project staging areas (per shot-hole borer best practices) (both mitigation sites), remove and dispose of trash and inorganic debris from Project treatment areas (both mitigation sites), conduct regular weed control from Project treatment areas for the duration of the contract period, install native container plants in rehabilitation areas (both mitigation sites), hydroseed enhancement and rehabilitation treatment areas (both mitigation sites), install temporary irrigation system (Paradise Canyon Open Space Mitigation Site only), hand water container plants through the contract period (Chollas Creek Mitigation Site only), provide truck watering for container plants at installation and through the contract period (Paradise Canyon Open Space Mitigation Site only). Additional services required from this scope of work includes providing qualified biological and cultural monitoring for the duration of the Project contract period. Biological services shall include monitoring and reporting and assuring compliance with Project avoidance and minimization measures. Cultural monitoring shall include development of Cultural Resources and Treatment Plan (CRTP) and monitoring, as required by the CRTP. 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids, South Chollas Creek Channel Mitigation Project Plans numbered 0100930-01-D through 0100930-05-D, and Paradise Canyon Open Space Mitigation Project Plans numbered 0100931-01-D through 0100931-16-D, inclusive. Bid Valid 120 Calendar Days The following voluntary subcontractor participation percentage for DBE, DVBE, WBE, MBE, SLBE, and ELBE certified Subcontractors shall apply to this contract: Total voluntary subcontractor participation percentage for this project is 10%. Any questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov 10.2. Questions received less than 14 days prior to the date for opening of Bids may not be considered.

Bid Results

Roads / Highways

$766,619.00

Public - City

Paving, Site Work

23

6

7

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
128
Bidding Soon
1,492
All Active Projects
720
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 25, 2023

August 24, 2023

December 23, 2023

img_map_placeholder

Multiple Locations, San Diego, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.