Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Denver, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
REFERENCE NO. DA1707-10 0043251.00 This Contract provides for the construction of the following: Approximately 2,000 LF of roadway and utilities along 48th Avenue from Tibet Road to E-470. The grading and SWMP measures for 48th Avenue will be completed upon the start of this project. This project also includes approximately 2,500 LF of roadway and utilities along Wenatchee Street from E. 48th Avenue to the south Windler boundary. The project also includes channel improvements to Tributary T. The Owner reserves the right to award the contract by sections, to reject any or all Bids, and to waive any informalities and irregularities therein. The Work is expected to be commenced within thirty (30) days after the Date of Contract. Bid Security in the amount of five percent (5%) of the total Bid Price must accompany each Bid in the form specified in the Instructions to Bidders. The Successful Bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond guaranteeing faithful performance and warranty bond for two-years after Substantial Completion, and the payment of all bills and obligations arising from the performance of the Contract. Bids will be received providing unit price for items; however, the price given will be on a maximum not-to-exceed amount, as described in the Bidding Documents. The project is located within the City of Aurora being a parcel of undeveloped land near E-470 and 48th Avenue. Specific location is shown on the construction plans: Construction Documents, E. 48th Avenue, N. Tibet Road to E-470, prepared by Westwood, sheets 1-35 inclusive and 38-39 inclusive, dated June 2023 Windler Subdivision Filing No. 3 - Wenatchee Street Construction Drawings, prepared by Westwood, sheets 1-29 inclusive and 33-53 inclusive, dated June 2023 Windler Filing No. 3 Tributary T North Branch, prepared by Westwood, sheets 1-39 inclusive, dated May 2023
Under Construction
Roads / Highways
$14,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
August 2, 2023
48th Ave, Denver, CO
Related To This Project
Denver, CO
Bid Date: Jul 12 2023
Denver, CO
Bid Date: Jun 28 2023
Denver, CO
Bid Date: Jul 03 2023
Denver, CO
Bid Date: Jul 20 2023
Denver, CO
--
Denver, CO
--
Denver, CO
Bid Date: Aug 02 2023
Denver, CO
Bid Date: Jun 27 2023
Denver, CO
Bid Date: Jul 25 2023
Denver, CO
--
Denver, CO
--
Denver, CO
Bid Date: Sep 01 2023
Denver, CO
Bid Date: Jul 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.