BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Rock Island, Illinois. Completed plans call for site work for a playground / park / athletic field.

o A bid tabulation shall be posted online afterward. All questions shall be directed to the Construction Officer at 309-732-2906. A bid tabulation shall be posted online afterward. All questions shall be directed to the Construction Officer at 309-732-2906. Establish erosion control with barriers. o Remove existing fencing & nets. o Remove Existing asphalt pickleball courts, leaving existing rock subgrade. o Roller compact existing grade before bringing new rock. o Options for 4" concrete reinforced slab vs. 4" asphalt continuous slab. New slab 1% slope. o Side walk from the North to the parking lot needs to meet ADA criteria. Asphalt material blended into existing parking lot. o Side walk from the South gate to the walking path needs to meet ADA criteria. Asphalt blended into the existing walking path making an intersection. o Elevation 679 going off the provided Topo for finished height of the court. o Total of 6 new courts with overall size 84'x 180'. o Rest area will be 20' down the center splitting courts to 3 on each side. o 6' tall perimeter black chain-link heavy duty fencing with black wind screening. o 4' tall interior black fencing isolating each court. Each court will need a 36" gate. o All fencing must be isolated from the court slab against frost heave. o Egress gate on and off the court will be one on the North and South End of the rest area 4' on the South and 8' on the North. o Playground equipment will be removed by Parks before work starts. o Court nets to be purchased and installed in the proper location's at regulation height. o Paint and striping lines shall conform to Pickleball regulations, colors to be chosen by the city at the Signing. o 6 Covered metal benches. Note ( Examples in the Bid Packet) o 3 Metal picnic tables. Note ( Examples in bid Packet) o Finished grade shall have sufficient fall away from the new court, with out creating any ponding or wet spots. o Hydro seed the bare soil upon completion. o Looking for electrical ran into the rest area for a few courtesy receptacles.

Award

Playgrounds / Parks / Athletic Fields

$384,200.00

Public - City

Site Work

3

6

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
81
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

August 21, 2023

Project location map

9009 Ridgewood Rd, Rock Island, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.