BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Joplin, Missouri. Working plans call for site work for a playground / park / athletic field.

“The owner has selected a Construction Manager. A timeline for construction has not yet been established.” The 14 acres Ewert Park was deeded to the City of Joplin on February 29, 1924, by Mr. Paul A. Ewert and his wife, Sidney T. Ewert. A prominent lawyer and onetime Assistant U.S. Attorney General, Mr. Ewert gave the Park and Pool to Joplin's African American citizens; but the Park was later opened for all citizens to use. Ewert Aquatic Center, located within Ewert Park, was renovated in 1974 and 2003 The new splash park is expected to include: Colored concrete and artificial turf, playground surfacing under dry play structure Additional shade structures (5), existing shade structure at the bathhouse will remain Ground sprays (33) Tall and larger sprays (8) Water table (1) Spray arches (1) Wet boulder sprays (2) Wet play structure (1) Dry play structure (1) Dry boulder play unit (1) Ice rink (12 width, 4,920 s.f.) Landscaping Bathhouse & buildings: Reconfigure entry/admission area Relocate mens shower tree Add 2 family changing rooms Condition the bathhouse to utilize in the winter months (for ice skating) Basic interior and exterior aesthetic improvements Recoat roof Improvements to the entrance between the bathhouse and concession building The City of Joplin has elected to pursue the Construction Manager at Risk (CMAR) project delivery methodology for this project. The selected CMAR shall provide planning (preconstruction) and professional inputs pertaining to construction schedules, construction market conditions, budgets, project-specific means/methods & constructability, and overall project construction costs. The City’s overall goal for CMAR services is to integrate construction expertise with the design process provide “value-added” efficiencies to project planning and construction execution.

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$5,900,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
527
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2024

July 12, 2024

img_map_placeholder

615 Murphy Blvd, Joplin, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.