Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Smithfield, Rhode Island. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This project, RICN 2023-CH-011 - Pavement Improvements - CHA, WES, Federal Aid Nos. NHP-RESF(448), NHPG-RESF(449), and 3RD-PRTY(334.ESC), primarily includes the pavement resurfacing of two (2) roadway segments: US Route 1 - Broad Street, Granite Street, and Franklin Street and US Route 1 - Post Road, and the pavement reclamation of a section of Old Post Road within the towns of Charlestown and Westerly, RI. The total length of pavement is approximately 6.76 miles, with the segments defined as follows: 1. US Route 1 - Broad Street, Granite Street, and Franklin Street from Union Street to Bellaire Street in Westerly 2. US Route 1 - Post Road from Robin Hollow Lane in Westerly to Tamanaco Drive in Charlestown 3. Old Post Road from US Route 1 - Post Road to US Route 1 - Post Road RIDOT - Pavement Improvements - CHA, WES FEDERAL-AID PROJECT NO. NHP-RESF(448), NHPG-RESF(449) & 3RD-PRTY(334.ESC) BRIEF SCOPE OF WORK This project, Rhode Island Contract No. 2023-CH-0011, Federal Aid Project No. NHPRESF(448), NHPG-RESF(449) & 3RD-PRTY(334.ESC) is for Pavement improvements on U.S. Route 1 (Broad Street, Franklin Street & Granite St) from Union Street to Bellaire Street, U.S. Route 1 (Post Road) from Robin Hollow Road to Tamanaco Drive and Old Post Road (Rte. 1A) at Klondike Road in the Towns of Charlestown and Westerly, Rhode Island, Washington County. The work will include, but not be limited to, full width micro milling and overlay, replacing existing berm, full depth reclamation with calcium chloride, cleaning and sweeping of pavement, installation of pavement marking, installation of stormwater treatment units and swales, cleaning and flushing of the drainage system, guardrail approach end replacement, new median guardrail, catch basin repairs, pedestrian push button extensions, installation of ADA compliant wheelchair ramps and all incidentals, complete in place and accepted, to complete the work of the contract to the satisfaction of the Engineer. In accordance with Section 108.08, Failure to Complete on Time, Para. a., Phased Completion, Interim Completion and Substantial Completion the following defines the Interim and Substantial Completion Dates and Associated Liquidated Damages: Interim Completion: December 1, 2023 All micromilling, paving (friction course, Mod. Class 9.5 HMA w/pay adjustments, Class 19.0 HMA), reclamation, adjustments and/or repairs to drainage structures, waterborne paint pavement markings, epoxy resin pavement markings, and pedestrian landings shall be completed on U.S. Route 1 (Post Road), from Robin Hollow Lane to Tamanaco Drive, on Old Post Rd (1) (Sta. 509+10 -523+44+-) and on Old Post Rd (2) (Sta. 600+61- 615+10+-) as defined by Section 101.71. Liquidated Damages: $1,950.00 per calendar day. All Contract work shall be completed, as defined by Section 101.71. Liquidated Damages: $2,350.00 per calendar day.
Bid Results
Roads / Highways
$16,848,417.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2023
August 21, 2023
Multiple Locations, Smithfield, RI
Related To This Project
Smithfield, RI
Bid Date: Jul 14 2023
Smithfield, RI
--
Smithfield, RI
--
Smithfield, RI
Bid Date: Nov 20 2020
Smithfield, RI
Bid Date: Aug 22 2023
Smithfield, RI
Bid Date: Sep 21 2023
Smithfield, RI
Bid Date: Dec 02 2021
Smithfield, RI
Bid Date: Oct 26 2021
Smithfield, RI
Bid Date: Jul 13 2023
Smithfield, RI
Bid Date: Jun 20 2023
Smithfield, RI
Bid Date: Jun 20 2023
Smithfield, RI
Bid Date: May 22 2023
Smithfield, RI
Bid Date: May 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.