BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Bellaire, Texas. Completed plans call for site work for a water / sewer project.

The work consists of providing the necessary labor, material, equipment, and supervision to construct Saint Tropez 0.2 MGD Wastewater Treatment Plant for Saint Tropez Laguna Azure, LLC on behalf of Harris County Municipal Utility District No. 515. The site work contractor is responsible for all site work, including but not limed to clearing and grubbing of the site; construction of wood fence; a sixteen-foot (16') diameter concrete lift station wet well complete with three (3) submersible pumps with all accessories, riser piping, valves, coatings and supports; yard piping, influent force main, sanitary sewer, effluent piping and manholes; site work; storm piping and outfall; crushed concrete roads and IWTP pad; protective coatings, concrete pads; swales, culverts, and inlets; new utility electrical service; service entrance equipment; diesel generator and automatic transfer switch; 480V distribution panelboard; 120/240V panelboard; transformer; lighting contactor panel; auto dialer; SPD; site lighting; electrical rack and supports; manhole; underground duct banks; wires and conduits from the terminal boxes at Aeration Basin No. 2 to the electrical rack; installation of the PLC panel at the rack; lift station control panel; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The lease of the 200,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; sodium hypochlorite disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Aeration Basin No. 2); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the force main piping upstream of the manual bar screen and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 18-inches (18") above finished grade at all locations. The site work contractor shall perform all electrical work including connection from a new electrical service to the service rack including all aboveground conduit and wire to pads. The plant lease contractor is responsible for all electrical work downstream of the local control panels, including the control panels. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the local control panels for the leased equipment. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. The Owner reserves the right to reject any or all bids and waive any or all irregularities. In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions will not be considered after 12:00 p.m., noon, three (3) calendar days prior to bidding. Remove and replace the attachment with the attached, revised version. Section 1.0.a was revised to add the off-site crushed concrete access road to the scope and to clarify the division of electrical scope between the site contractor and the lessor.

Post-Bid

Water / Sewer

$4,700,000.00

Public - County

Site Work

67

17

24

5

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
2,729
All Active Projects
963
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.