Site work and paving for a sidewalk / parking lot in Bridgewater, Virginia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

PN-21-0129.001 Bids shall be accompanied by a 5% bid security. Bid bond must be in the form of a cashier's check, certified check, or a bid bond issued by a surety.Prior to signing the Contract, the Owner will require the successful bidder to secure and post a Labor and Materials Payment Bond and a Performance Bond, each in the amount of 100% of the Contract Sum. Such Bonds shall be issued by a Surety acceptable to the Owner. All questions must be received no later than July 17, 2023 at 4:30 p.m. Phase II of Riverwalk is the construction of a paver shared-use path starting at the western terminus of Riverwalk, Phase I, running along the southeastern side of Bridgeview Park, then parallel to West Bank Street until it connects to West Bank at the entrance to Bridgeview. Riverwalk, Phase II also installs a crosswalk between the Riverwalk path and an existing sidewalk on West Bank Street. The Phase II path is 10' wide and approximately 950 linear feet in length. A valid business license from the Town is required for successful award of this project. At or prior to delivery of the signed Agreement/Contract, the bidder to whom the Contract is awarded shall deliver to the Owner a copy of their Town Business License. The bidder shall ensure that the Business License indicates a basis amount equal to or greater than the awarded Contract value. Contractors shall indicate a unit price for each item listed in the Pay Items Summary which follows. The listed pay items are to contain all necessary costs required for completion of the work. It is understood that all quantities listed below are estimated quantities and the Owner reserves the right to raise, lower or eliminate any quantity or item. If any quantities are more than 10% of the bid quantities during construction, Town may renegotiate price with Contractor. Unit prices shall be used in determining partial and full payment. The Contract, if awarded, will be awarded to the lowest responsive and responsible bidder, meeting all specifications, subject to the Owner's right to reject any or all bids and to waive informality and irregularity in the bids and in the bidding.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

21

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
23
Bidding Soon
472
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

August 28, 2023

img_map_placeholder

214 W Bank St, Bridgewater, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.