BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Miami, Florida. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of September 13, 2023, no bids received for this project. As of this time it is unknown if and when project will rebid. Counties: Miami-dade Road Name: SR 90 (US 41 / SW 8 ST) Limits: Over Sr 90 (Us 41 / Sw 8 St) and C-4 Canal W of Sw 109 Ave Project(s): 44704615201(*) Federal Aid No: TGER002A Total Roadway Length: 0.470 Miles Contract Days: 680 Total Bridge Length: 0.055 Miles Total Proposal Length: 0.525 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:180 Days The Improvements Under This Contract Consist of Pedestrian/wildlife Overpass Along Ped Bridge Over Sr 90 / Us 41 / Sw 8 St and C-4 Canal West of Sw 109 Avenue in Miami-dade County. Mandatory Pre-bid Meeting There Will Be a Mandatory Pre-bid Meeting for This Project at 10:00 Am Est on Monday, July 10, 2023, At the Florida Department of Transportation, District 6 Auditorium, 1000 Nw 111th Ave., Miami, Fl 33172. If You Have Any Questions Concerning This Matter, Please Contact Daniel Kong at D6- Dca@dot.state.fl.us. This Pre-bid Meeting is Mandatory Because of the Complexity of the Project. Only Plans and Specifications Will Be Available Prior to the Pre-bid Meeting. The Prospective Bidder Shall Be Prequalified According to the Requirements of Fdot Rule Chapter 14-22 and Section 2-1 of the 2023 Standard Specifications for Road and Bridge Construction. Proposals (Bidding Documents) Will Be Issued Only to the Prospective Bidders Who Have Attended The Pre-bid Meeting and Met the Florida Department of Transportation Qualifications for This Project. Prospective Bidders Ordering Bid Documents Prior to the Pre-bid Meeting Will Be Given Access to Download the Bid Documents Within 24 Hours After the Pre-bid Meeting. Those Prospective Bidders Ordering the Documents After the Pre-bid Meeting Will Need to Contact the Office Advertising the Project to Confirm Attendance and Receive Access to Download the Bid Documents. Please Contact the Office at Least Two Working Days Prior to the Deadline for Obtaining Bid Documents To Allow Time for Processing.. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 014 Pedestrian / Wildlife Overpass / Bridge - SR 90

Final Planning

Sidewalks / Parking Lot

$20,805,468.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
123
Bidding Soon
1,775
All Active Projects
772
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2023

March 13, 2024

May 4, 2026

img_map_placeholder

US Hwy 41 & FL-90, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.