BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a fire / police facility in Emporia, Kansas. Working plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. Question Deadline 07/19/2023 Requirement for Bid Security 1.Bid Bond or Check (For Bids on amounts over $100,000) a. A certified cashier's check, bid bond, or money order made payable to the City, in the amount of 5% of the bid, may be required of all bidders. The bid bond or check of the successful bidder shall be retained by the City until completion of the work or submittal of a performance bond (if applicable) to ensure the delivery of the supplies and/or service at the specified time and/or the successful completion of the project. Performance and Payment Bonds 1.State Statute Required Contract Bond or Security a. Performance Bond A performance bond satisfactory to the City, executed by a surety company authorized to do business in Kansas or otherwise secured in a manner satisfactory to the City for the performance of the work provided for in the contract, in an amount equal to 100% of the price specified in the contract. The total project construction cost is estimated to be $10 Million. Delivering the completed project within this budget is a high priority. It is important that the Owner, design team, and CMAR (collectively the "Project Team") work cooperatively and successfully to keep the final cost of the construction within this fixed budget. The Owner reserves the right, in its sole and complete discretion, to reject any and all submittals or cancel this RFQ, at any time prior to the time a contract is fully executed, for any reason. The Owner is not liable for any costs the proposer ("Proposer") incurs in preparation and submission of its submittal, in participating in the RFQ process or in anticipation of award of the contract. Section: “Scoring Criteria (Phase I):” Proposed Fees are listed as a scoring criteria. Fees are not included in Phase I of this project and therefore submissions will not be graded on this criteria.

Pre-Construction/Negotiated

Fire / Police

$10,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
356
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2023

March 25, 2024

img_map_placeholder

120 E 5th Ave, Emporia, KS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.