This is a service / maintenance or supply contract in Washington, District of Columbia. Contact the soliciting agency for additional information.
Storm Sewers Scope: Provide all materials, equipment, supervision, and labor to vacuum and power jet storm sewer sites on an annual basis. Areas included will be all parking lots and roadways including all catch basins and manholes. Frequency: Annually in November/December. Invoices billed at the end of service. Hours of Work: Work to be performed during the hours of 7:00 AM to 3:30 PM, Monday thru Friday. Work to be performed annually in late November to early December when all leaves are down. Work will be scheduled in advance through the COR. COR to determine if/when ground conditions are able to support service equipment. PM Procedures: Working from a site map of facility, provided by the COR, the Contractor will start from the furthest point at the facility Storm Sewer (unless directed differently) and work towards the main deposit storm sewer area leading off of the facility grounds. Remove grating or cover to gain access to storm sewer. Vacuum all heavy debris from access point. Power-jet lines to ensure free flow to next access point. Replace cover. Contractor will review progress and each day finding with Plumbing Shop Foreman or Plumbing Shop Leader. Debris collected at the end of each day can be deposited at an area designated by Chief, Operations Section, as coordinated by the Plumbing Shop Foreman in advance of scheduled service date. Contractor will get water for the power jetting truck from designated areas set by the Plumbing Shop COR. Sanitary Sewers Scope: Provide all materials, equipment, supervision, and labor to jet and/or snake sewer main discharges on wings B, C, D and E inside and outside and Laterals and Stacks (on a as needed basis) in all buildings. (Bldg. 1, 4 6, 14, 16) Hours of Work: Work to be performed during the hours of 7:00 AM to 3:30 PM, Monday thru Friday. Unless contacted outside of normal business hours. PM Procedures: Working from a site map of facility, provided by the COR, the Contractor will start from the furthest point at the facility Sanitary Sewer (unless directed differently) and work towards the main deposit sanitary sewer areas leading off of the facility grounds. Base + Four Option years Period of Performance (POP): Base Year: 8/21/23-8/20/24 OPT One: 8/21/24-8/20/25 OPT Two: 8/21/25-8/20/26 OPT Three: 8/21/26-8/20/27 OPT Four: 8/21/27-8/20/28
Post-Bid
Water / Sewer
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2023
August 21, 2023
50 Irving St NW, Washington, DC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.