Site work for a water / sewer project in Lawrenceville, Georgia. Completed plans call for site work for a water / sewer project.

The work to be performed under this contract includes the construction of approximately 5,700 LF of 24" and 160 LF of 8" DIP gravity sewer main, 18 manholes, 50 LF of 48" steel casing open cut installation, restoration of all disturbed areas to pre-construction conditions, and all other appurtenances as shown on the drawings or specified within the contract documents as required to complete the project All Bidders are required to submit a Bid Bond or a certified check made payable to the Gwinnett County Board of Commissioners in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid. The successful bidder will be required to furnish a contract Performance Bond and Payment Bond, each in the sum of 100% of the total amount bid and provide insurance coverage as required by the contract documents Bonding Company should be licensed to do business in Georgia, licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by the Georgia Insurance Department, listed in the Department of the Treasury's Publication of Companies Holding Certificates of Authority as Acceptable Surety on Federal Bonds and as Acceptable Reinsuring Companies and must have an A.M. Best rating of A-VI or higher Question Deadline 07/26/2023 at 3:00 PM ET The County will award the Contract to the lowest "qualified" bidder, subject with the Owner's right to reject any or all bids, Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from the date of the "Notice to Proceed" and he further agrees that the Owner may retain from the monies which may become due the amount of $1,000.00 (Substantial) / $500.00 (Final) for each and every day that the completion of the work may be delayed. CONSECUTIVE CALENDAR DAYS FOR COMPLETION: 485 (Substantial) / 515 (Final)

Award

Water / Sewer

$2,776,090.00

Public - County

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
92
Bidding Soon
1,531
All Active Projects
670
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

September 11, 2023

img_map_placeholder

Multiple Locations, Lawrenceville, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.