BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2023 at 8:00 PM

Updated August 20, 2025

Demolition, site work and new construction of a mixed-use development in Santa Barbara, California. Completed plans call for the construction of a 450,000-square-foot playground / park / athletic field; for site work for a playground / park / athletic field; water / sewer project; and for the demolition of a playground / park / athletic field.

PROJECT DESCRIPTION: The project renovates and reconfigures the existing 450,000 SF Cachuma Lake RV park campground. Contractor shall remove and upgrade all sewer, water and electrical utilities, expand fire suppression infrastructure. Demolish and construct new reinforced concrete RV pads, paving, trash enclosures and a new comfort station (restroom and shower) facility with added solar panels. Contractor shall install a new WiFi system, irrigated landscaping, natural stone bioswales, campground furnishings and recreational amenities. Each Bid must be accompanied by cash, a certified or cashier's check, or an original Bidders Bond in an amount not less than ten percent (10%). The "payment bond for public works" must be in an amount of one hundred percent (100%). The "performance bond" must be in an amount of one hundred percent (100%) . LIQUIDATED DAMAGES: The liquidated damages will be $4,200 (Four Thousand Two Hundred Dollars) per day for project delays that are determined to be attributable to the CONTRACTOR. WITHDRAWAL OF BIDS: The COUNTY reserves the right to reject any and or all bids or waive any informality in a bid. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening thereof. QUESTIONS: All questions MUST be submitted electronically through the Public Purchase Portal on or before 3:00 P.M., Thursday, August 17, 2023. Any changes or additional information needed for bidding will be provided in an Addendum posted on the Public Purchase site. Contractors shall be responsible for addendums. Estimated cost of construction is $15,132,000. The COUNTY reserves the right to select any one or any combination of bids, whichever is in the best interest of the COUNTY.

Award

Playgrounds / Parks / Athletic Fields

$12,650,888.00

Public - County

Demolition, New Construction, Site Work

113

33

115

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
62
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 23, 2023

Project location map

1 Lakeview Dr, Santa Barbara, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.