BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to an educational facility in Burlington, Illinois. Completed plans call for the addition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and educational facility.

Demolition, site work, new construction and addition to an educational facility in Burlington, Illinois. Completed plans call for the addition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and educational facility. Central Community Unit School District 301, Kane County, Illinois, that sealed bids will be received for the following: Central CUSD 301 Central HS Addition This project consists of an addition to Central High School and associated site work. The project is scheduled to start September 2023. There will be not be a pre-bid meeting for this Bid Release. Contractors can please contact SMC Construction with any questions or Bid RFIs. Bids for respective packages are due prior to the indicated time. See the specific Scope of Work for work inclusion and responsibility. Generally, the work may be described as follows: BP #03A - Building and Site Concrete BP #31 - Excavation/Site Utilities The Bidding Documents can be obtained Electronically All bids offered must be accompanied by a Bid Bond, in an amount not less than ten percent (10%) of the aggregate of the Base Bid and all Alternates, made payable to the Owner as a guarantee that if the Bid is accepted, a Contract will be entered into and the performance of the Contract is properly secured. Bids may be held for a period of ninety (90) days from the date of bid opening for the purpose of reviewing the Bids and investigating the qualifications of Bidders prior to awarding the contracts. The successful Bidder for the project will be required to provide a Performance Bond and a Labor and Material Bond in the sum equal to one hundred percent (100%) of the amount of the Bid. The Successful Bidder shall furnish sufficient insurance of guarantee of indemnity to the Owner, Architect, and Construction Manager against any and all claims which might arise for damages to persons or property due to the negligence of himself, his employees or agents during the construction of said improvements and after the said improvement has been finally accepted as complete by the Owner. See Trade Contractors Safety, Indemnity and Insurance Requirements for required minimum insurance limits. This project is subject to the State of Illinois Prevailing Wage requirements for Kane County, IL, "Illinois Prevailing Wage Act (Ill. Rev. Stat., 1987 Ch. 48, Sections 398 x-1-12 as amended by Public Act 86-693 and 86-799 effected January 1, 1990). Additional Bidder requirements are included in the Bidding Documents. The owner reserves the right to (1) accept Bidders Base Bid or portions thereof, (2) accept any one or more of the Bidders Alternate Bids, in any order regardless of the order in which they are listed, (3) reject any and all Bids, (4) award contracts based upon its investigation of Bidders, as well as acceptance of Alternates, all of which the School District deems to be in its best interests, and (5) waive any informalities or minor irregularities in Bids and waive minor irregularities or discrepancies in the bidding procedure, all at the owners discretion. The Owner reserves the right to amend the bid documents, including the plans, and specifications, Scope of Work Notes and Supplemental Conditions, at any time prior to the bid opening, with reasonable notice to the bid packet holders. The Bidder acknowledges that the Freedom of Information Act, 5 ILCS 140/1 et seq. (the Act) places an obligation on Central Community School District 301 (the Owner), to produce certain records that may be in the possession of Bidder. Bidder shall comply with the record retention and documentation requirements of the Local Records Retention Act 5 ILCS 160/1 et seq. and the Act and shall maintain all records relating to any work being done for the Owner in compliance with the Local Records Retention Act and the Act (complying in all respects as if the Bidder was, in fact, the Owner). Bidder shall review its records promptly and produce to the Owner within two business days of request by the Owner the required documents responsive to a request under the Act. If additional time is necessary to comply with the request, the Bidder may request the Owner to extend the time do so, and the Owner will, if time and a basis for extension under the Act permits, consider such extensions. Bidder further acknowledges that the Act, as amended and effective January 1, 2010, provides for severe criminal and civil penalties for willful failure to comply with its terms. Accordingly, Bidder does hereby agree, as an additional condition of being awarded a bid or the Construction Manager agreeing to contract with Bidder to provide labor, services or materials to the Owner, that it will hold harmless and indemnify, including costs and reasonable attorneys fees, the Construction Manager, the Owner and its Trustees, officers, agents and employees, against all damages incurred or penalties or fees assessed against it or them because of non-compliance with this agreement or the Act or the production requirements imposed under the Act.

Post-Bid

Educational

$6,000,000.00

Public - City

Addition, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
128
Bidding Soon
2,109
All Active Projects
893
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

October 30, 2023

img_map_placeholder

275 South St, Burlington, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.