EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Pittsburgh, Pennsylvania. Completed plans call for site work for a road / highway.

Security in. the sum of 10% of the bid price ($ dollars) in the form of Bid Bond, Bank Cashier s Check, or Bank Treasurers Check is submitted herewith in accordance with Specifications Performance Bond Full amount ofthe Contact Labor & Materialmen Bond Full amount ofthe Contact Maintenance Bond Full amount ofthe Contact (2 year's) (100% offinal Contract) Performance and Labor & Materialmen Bonds shall be furnished upon request of the Owner, at least five (5) days prior to the date set for the award of Contract and shall be dated as ofsuch date. The work shall be completed within 240 ccwsecn five calendar days, which shall begin after receipt from the Owner Should a Contractor fail to complete his work on or before the time set forth above or as provided in the Contract Documents covering extension of time., the Owner may retain an amount equal to S200.00 per calendar day as liquidated supplemental damages for each calendar day in accordance with this provision.

Award

Roads / Highways

$351,269.00

Public - County

Site Work

4

13

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
123
Bidding Soon
1,020
All Active Projects
464
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

August 7, 2023

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cheswick Traffic Signal Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.