Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Bowling Green, Ohio. Completed plans call for the renovation of a educational facility.

The planned scope of work includes structural reinforcement of the existing parapet at University Hall. Efforts also include removal and replacement of existing roofing membrane. EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Project Work Start Date: August 14, 2023 Substantial Completion Work Date: October 31, 2023 The time for Substantial Completion of all Work is 85 consecutive days from the Commencement Date in the Notice to Proceed. More Info: Charlie D. Hetman, Phone: 216-861-2020, E-mail: chetman@osborn-eng.com

Bid Results

Educational

$149,460.00

Public - State/Provincial

Renovation

8

11

5

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
124
Bidding Soon
1,991
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

August 14, 2023

Project location map

1001 E Wooster St, Bowling Green, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed