Renovation of an educational facility in Altoona, Pennsylvania. Completed plans call for the renovation of a educational facility.

Question Deadline 07/14/2023 The Altoona Area School District will receive sealed bids for the Irving Elementary - Façade Improvements project Ebner: Large louvers - door assemblies on South wall: install new doors and hardware in existing frames; paint existing frames, louvers and existing overhead coiling door and frame. Provide paint samples with submittals. 2-Irving Room 115 Stem and 119 Media Center / Library all windows in these areas to be fixed - non-operable. 3-Irving: Detail E8/AE601 shows new fluted aluminum column covers, new aluminum column covers to be straight, not fluted. Remove and Replace All Existing Windows With Aluminum Windows and Insulated Glaziing Remove and Replace All Existing Exterior Storefront and Interior Storefront (Where Indicated) Including Doors With Aluminum Frame and Insulated Glass . Remove and Replace Exterior Metal Doors (Where Indicated) With Insulated Aluminum Doors and Aluminum Frames. Furnish and Install New Door Hardware for the New Doors. Reinstall Salvaged Cameras, Speakers and Card Readers Clean and Paint Existing Exterior Louvers Remove and Replace Caulking at Exterior Control and Expansion Joints. Remove and Replace the Horizontal Face of the Bulkhead Above Windows Where Indicated Install Roller Shades Where Indicated Remove and Replace Fabric Curtains Where Indicated. Install Ball-stop Netting System to Protect the Windows in the Gym

Award

Educational

$879,591.00

Public - City

Renovation

9

15

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Flooring, Carpeting, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
44
Bidding Soon
508
All Active Projects
268
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

June 6, 2024

img_map_placeholder

308 Hillside Ave, Altoona, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mowrie Ebner Elementary - Façade Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.