BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a clubhouse / community center in Fremont, California. Completed plans call for site work for a clubhouse / community center; and for paving for a clubhouse / community center.

Removal and disposal of existing concrete pathways, rough grading, installation of new ADA-compliant concrete pathways, removal of non-compliant curb ramps, installation of ADA curb ramps, new curb and gutter, cast-in-place concrete retaining wall, concrete curbs, concrete mow bands, decomposed granite pavement, tree protection fencing, trunk wrap protection, temporary construction fencing, irrigation modifications, installation of removable bollard, removal and re-installation of signage, and other items required by the plans, specifications, and special provisions Bid proposal must be accompanied by bid security of 10% of the maximum bid amount The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: 50 (fifty) working days. Estimated Project Cost. The estimated construction cost, or construction cost range, for the Project is $489,880. This estimate serves only as a guideline to bidders of the scope of the Work and the Project. No bidder, including the successful bidder, is entitled to make any claim against City based on inaccuracy of the estimated cost or range of cost of the Work or the Project. License. This Project requires a valid California contractor's license for the following classification(s): Class A. Contractors bidding as a joint venture must secure a joint venture license prior to award of the Contract for the Project. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Minimum Wage. This Contract may be subject to the City Minimum Wage Ordinance, codified in Fremont Municipal Code Chapter 5.30. Contractor represents it has read and understands the City's minimum wage requirements and agrees to fully comply with the ordinance. Contractor shall promptly provide any documents and information required by City to verify compliance. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Clubhouse / Community Centers

$485,532.00

Public - City

Paving, Site Work

24

15

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
179
Bidding Soon
3,185
All Active Projects
1,283
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 19, 2023

August 18, 2023

October 27, 2023

img_map_placeholder

Multiple Locations, Fremont, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.