BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Longmont, Colorado. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a road / highway.

R4 FY24 Signal pole replacement project at two intersections in Longmont. Work will include signal pole replacement and curb ramp improvements on US 287 at 11th Ave and 19th Ave. Region: 4 Counties: Boulder It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 Contract UDBE Goal: 0.00 % CODOT - 004 - R4 FY24 Signal Pole Replacement Project at Two Intersections in Longmont

Award

Roads / Highways

$5,000,000.00

Public - State/Provincial

Paving, Site Work

145

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
85
Bidding Soon
1,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

September 18, 2023

Project location map

19th Ave, Longmont, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.