Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Myrtle Beach, South Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Last Day for Questions: July 25, 2023, by 5:00pm Deliver and construct a pre-engineered Contech Pedestrian Truss Bridge for crossing the existing drainage canal at the Market Common area Linear Park adjacent to the ITAP Aviation Industrial Park. The contractor must also construct all necessary bridge abutments, foundations, approaches, and bridge deck for the successful completion of the bridge. The owner deserves the right to add or delete or change the scope of work as funding allows. Thunderbolt Park Pedestrian Bridge. This project consist of delivering and constructing a pre-engineered Contech Pedestrian Truss bridge for crossing the existing drainage canal at the Market Common area Linear Park The awarded Contractor must also construct all necessary bridge abutments, foundations, approaches, and bridge deck Additional questions are due no later than close of business on Tuesday, July 25, 2023. Questions may be submitted via e-mail to bhancock@cityofmyrtlebeach.com All questions received by the deadline will be answered via addendum to be published no later than August 1, 2023.

Award

Bridges / Tunnels

$399,998.00

Public - City

Paving, Site Work

13

16

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
47
Bidding Soon
902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

Project location map

2290 Farrow Pkwy, Myrtle Beach, SC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed