BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.

The work will include but not be limited to the following objectives: 1. Contractor shall furnish and install all required components and accessories as outlined in the design documents for a complete and operable turn-key system. 2. Quality workmanship is a high priority for the District and the Contractor shall be held to a high-level of professional workmanship. Contractors unfamiliar with the District's standards shall familiarize themselves with the standards and requirements prior to beginning work 3. The Contractor shall furnish and install all required fire-treated 3/4" (three quarter inch) plywood for the MDF and all IDF locations. 4. The Contractor shall furnish and install a ground bus bar at the MDF and IDF rooms. 5. The Contractor shall furnish and install all required racks and cabinets. 6. The Contractor shall furnish, install, and configure uninterruptable power supply(ies) (UPS) for the MDF and/or IDF racks. 7. The Contractor shall furnish and install all newly required conduit/raceway. 8. The Contractor shall furnish and install all wire/cable (copper/fiber optic) as required. 9. The Contractor shall terminate all strands of fiber at each fiber enclosure. 10. The Contractor shall furnish and install termination all end-point equipment (patch panels, jacks, wallplates, enclosures, etc.). 11. The Contractor shall furnish and install all patch cords (copper/fiber). 12. The Contractor shall test and certify installed cable plant. The work will include but not be limited to the following objectives: 1. Provide, coordinate, and install all required equipment and accessories as outlined in the design documents for a complete and operable system. 2. Labor and Materials: The Contractor shall provide and pay for all labor, supervision, materials, accessories, components, equipment, tools, utilities, construction equipment and machinery, transportation, and other facilities and services necessary for the proper execution, operation, and completion of a turn-key system to the District. 3. Data Communications Network Equipment: Includes, but is not limited to: a. Routers b. Firewalls c. Networking Switches d. Wireless Access Points e. VoIP Phone Equipment f. Uninterruptible Power Supplies (UPS) The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. The Project consists of but not limited to: Provision of all clocks, bell and intercom equipment, licenses, software and accessories for complete and fully operational system. The contractor shall provide all data network equipment, licenses, software and accessories for complete and fully operational data network system. All touch up paint to match existing conditions for new locations for install or areas of demolition. Per plans and specifications prepared by KMM Services. Brands to be used are: Rauland intercom system, Sapling Clocks, Cisco Switch boards, and in some limited cases, Aruba units. For more detailed information please refer to District specifications. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Tina Alvarez-Bevens at Tina-AlvarezBevens@scusd.edu, Chris Ralston at chris-ralston@scusd.edu, Robert Aldama at Robert-aldama@scusd.edu and cc: Olakunle Gbadamosi, B&D at ogbadamosi@bdconnect.com. Questions not received by July 10, 2023 by 2:00 pm may not be answered.

Award

Educational

$242,000.00

Public - City

Renovation

12

11

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
82
Bidding Soon
1,553
All Active Projects
642
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

August 21, 2023

img_map_placeholder

7300 Marin Ave, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.