Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 19, 2023 at 7:00 PM

Updated October 24, 2026

Site work for a hospitality development in West Sacramento, California. Completed plans call for site work for a hospitality development.

The City of West Sacramento is seeking bids to construct and install a security fence and gates at the City facility located at 920 West Capitol Ave in West Sacramento. As part of this project an ADA compliant ramp needs to be constructed to connect the office to the sidewalk. West Sacramento is a vibrant riverfront community centrally located in Northern California. West Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 53,000 people. The City is full-service with nine (9) departments and over 400 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. Question Deadline 07/20/2023 at 3:00 PM PT egend and Specificatons: A. Existng Office. B. Pour new ADA compliant concrete sidewalk to extend and match the existng walkway south to the sidewalk. C. New 6' tall x 18' wide wrought iron swing gate. 2"x6"x 1/4 " frame w/1"x1" spindles. Recommend Limaster 2100U Hinges or equivalent. Heavy duty electric gate opener. Recommend Limaster CSW24 UL or equivalent. D. 3 ea. New 6"x6"x8'x1/4" wall tubing posts w/ 24" imbedded in 18"d x 30" deep concrete base. E. New 6"x6"x9'x3/8" wall tubing posts w/ 30" imbedded in 18"d x 30" deep concrete base. F. Card Reader location: Limaster EL200SS RFID Card Reader with audio, video and light to office. Install Knox Rapid Access Device. G. New 42" wrought iron walk in gate. Card Reader entry with camera and audio function into office. H. Two New 6' tall wrought iron fence secons. 2"x6"x 1/4 " frame w/1"x1" spindles. Approx length 12' each. I. Existng walkway. Construction Notes: Saw Cut asphalt pavement prior to trenching. Line voltage run in separate conduit. Low voltage, video, audio, and control can be run in same conduit. 120v for batery recharge and post light can be pulled from existing electrical in office. All posts to have welded cap. Installation Notes: Client has a security system installed. Bid to include providing compatble camera at entrance post and man gate with coax cable to office. The EL2000 Card Reader has the Versa XS 4 management software

Award

Hotel / Motel

$59,341.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
204
Bidding Soon
3,077
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

January 11, 2024

Project location map

920 W Capitol Ave, West Sacramento, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed