BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2023 at 8:00 PM

Updated September 12, 2025

Site work and new construction of a mixed-use development in Snohomish, Washington. Completed plans call for site work for a playground / park / athletic field; and for the construction of a playground / park / athletic field.

Averill Field Improvements - Phase I The City of Snohomish is seeking a contractor to furnish all labor, materials, and equipment necessary to construct the park improvements in the City of Snohomish as shown on the project plans and specified in the technical provisions. The Work to be performed under this contract provides for constructing a new playground area, sports courts, utility improvements, concrete walkway, lighting, plantings, and other Work necessary to complete the project as shown on project plans and specified in these technical provisions for the City of Snohomish, Snohomish County, Washington. Contract award will be made to the lowest, responsible, responsive bidder based on the total Base Bid. In addition to the Base Bid, the Owner, at their discretion, may choose to award Additive Alternate 1 and/or Alternate 2. Engineer’s Estimate Range: Base: $570,000 to $670,000 If the successful bidder does not enter into a contract and file a performance and payment bond and the required insurance certificates, with the City of Snohomish within ten (10) working days after Notice of Award of Bid, the amount of the bid deposit shall be forfeited to the City of Snohomish. Unsuccessful bidders' deposits will be returned upon City’s execution of contract documents or rejection of all bids. City of Snohomish Notice of Call for Bids Averill Field Park Phase I Improvement Project Page 2 of 124 A one hundred percent (100%) Contractor’s Performance and Payment Bond is required. The bond must be delivered to the Snohomish City Clerk within ten (10) working days after notification of the award to the successful bidder. The Bond must be approved by City officials before the contract award is final. The City of Snohomish reserves the right to reject any or all bids, and to waive irregularities or informalities in the bid or in the opening. The City of Snohomish reserves the right to delete portions of the work. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Playgrounds / Parks / Athletic Fields

$1,006,800.00

Public - City

New Construction, Site Work

28

7

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
92
Bidding Soon
1,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 1, 2023

Project location map

400 2nd St, Snohomish, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.