Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Duluth, Minnesota. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

The work will be done under one prime contract that includes: General The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Installation of a previously fabricated 135 ft concrete box culvert (provided by owner), with end sections through Minnesota Trunk Highway 23. Providing an aquatic and recreational connection between the St Louis River and Perch Lake. Est. Completion Date: June 30, 2024 No project Prebid Meeting is scheduled. All questions should be submitted no later than 2:00 PM on July 24, 2023.

Award

Water / Sewer

$1,341,797.00

Public - State/Provincial

Site Work

61

9

27

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
10
Bidding Soon
296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

September 26, 2023

Project location map

12100 MN-23, Duluth, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed