EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Ganado, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Apache County Road C-420 WE Project Notice is hereby given that sealed Bids are being solicited from qualified general contractors for the reconstruction of County Road C-420 (Ganado School Loop) in Ganado, AZ. The types of work on this project shall include, but not be limited to the following: - Removal of existing concrete - Install 4" curb and gutter, 6" valley gutter, and 5' sidewalk - Construct type "A" and "C" catch basin - Remove and replace 18" CMP - Removal of AC pavement and construction of new 3" AC pavement and 8" base course The construction time to complete the project is 120 calendar days from the date of the Notice to Proceed The Apache County reserves the right to reject any or all bids and to award all or part of the bid. Nevertheless, except when rejections of bids are required by law, the County reserves the right to waive any informalities of the Bid Questions regarding the technical specifics of the project should be directed to Ferrin Crosby, Apache County Engineer, fcrosby@apachecountyaz.gov (928) 337-7530

Post-Bid

Roads / Highways

$800,000.00

Public - County

Paving, Site Work

23

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
35
All Active Projects
14
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2023

July 31, 2023

img_map_placeholder

C420, Ganado, AZ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ganado School Loop Road Apache County Road C-420

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.