BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Griffin, Georgia. Completed plans call for the renovation of a 7,972-square-foot fitness / recreation center; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of 10/23/23 project has not been awarded. The approximate extent and character of the Work is generally described as follows: The project consists of but is not limited to the Renovation of the 7,972 SQ FT. Heritage Park Gymnasium and includes selective site demolition, new utilities with connections to municipal services, new grading/drainage, new storm sewer systems, new concrete sidewalks, selective demolition of building components, new foundations, new slab on grade, new load bearing CMU/Structural Steel/Cold Formed Steel Roof Framing, new metal framed stairs, pointing/repair/painting of existing masonry veneers, new exterior window/door systems, new roof/fascia/eave systems, new building insulation, new interior CMU walls, new interior floor/base/wall/ceiling finishes, new, new interior architectural millwork, new interior doors, new interior accessories/equipment, new plumbing fixture/piping systems, new HVAC/ductwork systems, new primary/secondary/general electrical distribution systems, new lighting systems and fire alarm devices/systems. The time allowed for Substantial Completion is 360 days, and the time allowed for completion and readiness for final payment is 390 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. *Plans and specifications are for viewing purposes only. All contractors must contact Paragon Consulting Group to purchase an official set.*

Bid Results

Fitness / Rec Centers

$3,873,952.00

Public - County

Paving, Renovation, Site Work

40

28

6

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
144
Bidding Soon
2,176
All Active Projects
1,026
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 12, 2023

November 13, 2023

December 9, 2024

img_map_placeholder

Multiple Locations, Griffin, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.