BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in New Hartford, New York. Completed plans call for site work for a water / sewer project.

The scope of work includes removing existing diesel engine/alternator, automatic transfer switch, and appurtenances from interior and exterior of the Valley View Pump Station building. Furnish and install new diesel engine/alternator, automatic transfer switch, and appurtenances. All work is depicted in Contract Documents. Proposals shall be submitted only on the forms contained herein and shall include a five percent (5%) bid security in a form described and shall be received only from persons who obtain Bid Documents from the MVWA and are duly registered on the list of bidders. The MVWA reserves the right to waive any informality and reject any and all bids. The MVWA may reject any bid if in its judgment the resources, financial standing, or experience of the bidder justifies such rejection in view of the work to be performed. The Board reserves the right to revise or amend the bidding documents prior to the date set for opening the bids. Packages containing bids must be sealed, marked, and addressed to the Mohawk Valley Water Authority, Engineering Department, Attention: Jolie Murray, 1 Kennedy Plaza, 3rd Floor, City Hall, Utica, New York 13502. Packages containing bids that are delivered by courier (i.e., FedEx, UPS, etc.)must be delivered to the Water Authoritys Engineering Department, 3rd Floor Office. Any inquiries regarding details in project documents must be directed to Dan Faldzinski, P.E. at dfaldzinski@mvwa.us. Any inquiries regarding details in project documents must be directed to Dan Faldzinski, P.E. at dfaldzinski@mvwa.us. Inquiries will not be accepted unless received by email. For purposes of this solicitation, MVWA hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises(MBE) participation and 15% for Women-Owned Business Enterprises (WBE) participation (based on the current availability of qualified MBEs and WBEs). The SDVOB Monthly Reporting Form is to be completed by the Contractor/Vendor, and submitted by the 10th day of each month for the duration of the Contract.

Award

Water / Sewer

$118,000.00

Public - City

Site Work

4

15

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
66
Bidding Soon
844
All Active Projects
450
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2023

September 4, 2023

img_map_placeholder

198 Valley View Rd, New Hartford, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.