BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Fountain Valley, California. Design plans call for site work for a water / sewer project.

Per the owner, this project has two projects. Owner states that construction on the first project is anticipated to begin in the summer of 2026 and construction on the second project is anticipated to begin in 2027. Per the owner, as of November 21, 2024, an award has been made for Owner's Advisor. Per the owner, the notice to proceed for the Owner's Advisor is December 9, 2024. Closed solicitation has been included below for reference. ...................... OC San is conducting this outreach to architectural, structural, geotechnical, and engineering consulting The Outfall system is a critical part of OC San's infrastructure and must continue to operate reliably as there are currently no plans for a replacement outfall. In an effort to continue proper operation and maintenance, the Outfall had numerous inspections, surveys, assessments and improvements performed since its construction. Planning Study PS18-09 Ocean Outfall Condition Assessment and Scoping Study was completed in 2022 to perform a detailed inspection of the interior and exterior of the 120-inch Outfall, the ballast, and all associated components from the Beach Box to the end flap gate. Project No. J-137 consists of two major parts: J-137A - This portion of the project will evaluate the condition of the 78-inch Ocean Outfall (hereinafter referred to as "Short Outfall") and will provide recommendations on improvements to extend the life of Short Outfall. The project may perform some repairs if needed to maintain the operability of the Short Outfall, since rehabilitation of Long Outfall (J-137B) requires the use of the Short Outfall. J-137B - This portion of the project will improve the conditions of the Long Ocean Outfall (hereafter referred to as "Long Outfall") as recommended by PS18-09 Ocean Outfall Condition Assessment and Scoping Study. The final report of the planning study will be included in the upcoming RFP.

Design

Water / Sewer

$19,000,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,434
All Active Projects
1,086
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

Multiple Locations, Fountain Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.