Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a power facility in Waterbury, Connecticut. Completed plans call for site work for a power facility.
CLARIFICATION DEADLINE 6/23/2023 2:00 PM The general scope of services for this RFP is for a qualified solar contractor to design, engineer, construct, operate, and maintain a solar photovoltaic array at the Mark Lane Landfill in Waterbury. The solar array will participate in the NRES Program, with VNM for SAM properties, administered by Eversource, and will provide financial benefit to the City through a long-term power purchase agreement. The following sections of this RFP provides detailed information on (1) the Property site; (2) construction requirements; and (3) NRES Program requirements to assist Proposers in developing their proposals for a solar photovoltaic array at the Mark Lane Landfill.
Post-Bid
Solar Power Generation
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
